Wireless
Our Technicians have extensive experience in the wireless sector
as they have worked on the following projects over the years.
Our Technicians have undertaken following activities on this project:
- Installation, Integration and Commissioning of Nokia Flexi BTS FSME/FSMF for U900,L700/L1800, L2100 and L2300 for Optus 4G Project
- Liaising with Optus RIC(Remote Integration Centre) and NOC for any Script, Commissioning and Integration Issues
- Installation, Integration and Commissioning of Nokia Flexi RF Module (FXDB-U900,FRPA-L700,) and Remote Radio Heads(FXEA/FXEB-L1800, FRGF/FRGT-L2100 and FZNI-L2300)
- Installing and testing Fibrecable from FSMF to Optus FibreDistribution Rack and from Optus Distribution Frame to External Break out Box to Hybrid Tail to RRH(FXEA/FXEB, FRGF/FRGT and FZNI-L2300)with Light Source and JDSU Optical Tester
- Installing GPS Antenna for FSMF-L2300
- Pre-Survey,Labellingand Documentation as per Optus Requirement
- Doing Video Call, Voice Call, Data Call speed test and Ping test for different technology for Optus Acceptance Test
Our Technicians have undertaken following activities on this project:
- Installation, Integration and Commissioning of Huawei Optix RTN 950 and RTN 350 Radio for Vodafone Microwave Transmission network
- Installation, Integration and Commissioning of Optus 10G Ceragon Radio for Optus Microwave Transmission Network
- Installation, Configuration and SW upgradation of Indoor Unit (IDU) SIAE ALCPlus2/ALCPlus2e for MW Transmission Network
- Installation, configuration and SW up gradation of Indoor Unit (IDU) Ericsson Mini link TN 2p, TN 6p and TN 20p for MW Transmission Network
- Installation and termination of E1 TRIB cable on DDF krone block
- Ethernet cabling between TN to Lease Line, SIAE Node to Lease Line, DCN Switch and Troubleshooting for NMS visibility
- Electrical and Optical OMS connectivity between SIAE Node, TN Node to OMS 1400 and Huawei CX 600 to ODF and test up to the Vodafone MTX.
- Organizing fibre in fibre tray and connection of fibre to fibre Hub(STM-1)
- Installation of HcPDP and feed through the Eltek Rack
- IDU DC cabling, IDU Earthing and Internal IF Tail cabling
- Labelling of Internal IF Tail, ACMA Labelling, DDF and TRIB cable labelling
- Cut over for CAT 6 and Cat 5 Activity, Migration of TDM traffic from Old Equipment to New Equipment and Liaising with Vodafone TIC (Transmission Integration Centre) for overall Smooth activity before and after Cut over
- Commissioning CAT 1 sites and Cat 2 sites to do E2E testing with JDSU Ethernet IP tester for the Huawei 2G Node, Huawei 3G Node B and Huawei 4G eNodeB(LTE)
- CAT 10 Activity -Decommissioning of Old MW System Internal and External
- Preparing all commissioning and acceptance Com doc like BER Test, MW Commissioning Doc, Inventory Report, ISN Report, JSA, Photos that comply with VHA requirements and uploading in Server for ORCA 7.5 and ORCA 8.0 Acceptance
Our Technicians have undertaken following activities on this project:
- Integration, commissioning and call test for Ericsson 6601 RBS and Ericsson 6201(ODU) RBS for Telstra KSD project (LTE-1800, 4G Network)
- Configuration of DUL (6601 RBS and 6201 RBS)
- Configuration SIU and ping to OSS
- Documentation for acceptance, commissioning and Site Handler
- Swapping the RRUs (Upgrade Revision), Filters and Antenna for KSD project
- Fixing the internal and external faults for KSD project (LTE 1800 4G Network), RET issues, RRU Link fail issues and Polarity
- Troubleshooting PIM issues for LTE 1800 and WCDMA 850 with PIM tester and VSWR Faults with Anritsu Site Master with RL and DTF
Our Technicians have undertaken following activities on this project:
- Diversity Unchaining Project for Nokia Siemens Network for (Vodafone and Optus JV sites)
- Mounting the combiners (Filters) and splitting the diversity between Optus and Vodafone sites
- Feeder cable sweeps (Using Site Master) before and after the combiner installing
- Troubleshooting for VSWR with RL, DTF Using Anritsu Site master and Dummy Load and fixing faults
- Recommissioning of Nokia 3G BTS after diversity cabling changes
Our Technicians have undertaken following activities on this project:
- Maintenance of Hutchison Mobile network(3GIS) WCDMA 3101 and 3202 Ericsson RBS across NSW
- Liaising with NOC for login to the site and troubleshoot the fault
- Fixing sector faults such as replacing MCPA, TRX, AIU, TUB
- Fixing the transmission faults for Harris and Siemens Radio
- Fixing the power related faults such as replacing faulty battery string, fixing circuit breaker and inverter faults