Broadband

Broadband

We have Hauled in excess of 400,000 meters of optical fibre cable from 1F- 576F and spliced more than 900 fibre joints on the NBN FTTC project for Downer and Lendlease.

We have installed and commissioned around 10,000 DPUs and Multi Ports that would be able to serve circa 40,000 premises on this project.

We have constructed more than 5000 copper joints from 5 pair to 200 pair onthe FTTC network for Visionstream, Downer and Lendlease and hauled copper cables from DPU to customer lead-in pits for preparing end premises to be connected to the FTTC network.

We have cut-over around 10,000 connections from ADSL network to FTTC network.

We have laid in excess of 50,000 meters of underground conduit and installed / replaced more than 500 NBN pits on the FTTC network.

NBN-FTTC

We have provided the following services for the NBN FTTC Project:

  • Underground and Aerial Cable Hauling
  • Mechanical and Manual Cable hauling of all sizes of fibre cables ranging from 1F to 576F
  • Fibre Cable installation and termination in Telstra Exchanges / NBN FAN Racks/ ODF and cable chambers
  • Optical Fibre Splicing and Jointing: Single and Ribbon (Underground and Aerial)
  • End to End OTDR Testing, Insertion Loss Testing and PON Testing
  • DPU Integrations
  • Copper and Ethernet Cable hauling and installation
  • Copper jointing of cables ranging from 2pr to 200pr
  • Service Cut-ins from ADSL network to FTTC Network
  • Underground Asset Location Services to locate existing utilities
  • Manual and Mechanical (Excavator and Trenchers) Trenching for underground conduit installation in any surface
  • Any surface breakout and re-instatement including Turf, Bitumen, Pavers, Concrete cutting, breakout and re-instatement
  • Underground boring for UG conduit installation
  • Installation of all sizes of telecommunication pits

We have installed in excess of 500,000 meters of co-axial cable (hardline / lead-in / internal) and installed and commissioned more than 5000 network devices that would be able to serve around 30,000 premises on the HFC network for Downer, VisionStream and Broadspectrum.

We have installed in excess of 50,000 meters of underground conduit and installed / replaced more than 500 NBN pits on this project for Downer and Visionstream.

Following activities were undertaken for this project:

  • Underground and Aerial Hardline Cable hauling (CX50, CX75)
  • Lead-in and internal cable installation (RG6, RG11)
  • Network device installation and commissioning (Line Extenders, GNA, Apartment Amplifiers, Line Equalisers, Taps, Isolators)
  • RF and End of line Testing
  • Troubleshooting
  • Internal cabling for Single or Multi-Dwelling Units
  • Underground Asset Location Services to locate existing utilities
  • Manual and Mechanical (Excavator and Trenchers) Trenching for underground conduit installation in any surface
  • Underground boring for UG conduit installation
  • Installation of all sizes of telecommunication pits
NBN-HFC-MDUs-and-SDUs

We have Hauled in excess of 100,000 meters of optical fibre cable from 1F-576F and spliced more than 200 fibre joints on the NBN BDOD project for activating fibre lines for businesses such as Woolworths, Coles, BWS and Officeworks.

We have provided the following services for the NBN FTTC Project:

  • Underground and Aerial Cable Hauling
  • Mechanical and Manual Cable hauling of all sizes of fibre cables ranging from 1F to 576F
  • Fibre Cable installation and termination in Telstra Exchanges / NBN FAN Racks/ ODF and cable chambers
  • Optical Fibre Splicing and Jointing: Single and Ribbon (Underground and Aerial)
  • End to End OTDR Testing, Insertion Loss Testing and PON Testing
  • Commercial Building internal cabling
  • Premises Device Installation and activation
  • Battery Backup System Installation
BDOD

We have activated NBN connections on FTTC, FTTP, FTTB and BDOD networks for around 7,000 residential or commercial premises.

We have also activated NBN connections on HFC network for around 10,000 residential or commercial premises.

OMMA-1

What Our Clients Say

I have dealt with ND Global on a weekly basis over a 2+ year period on NBN project.
I can confidently say their approach to each task that is performed is professional from end to end to say the least.
They had thorough knowledge and understanding of the works they undertake. They had correctly skilled staff performing different duties while maintaining high level of workmanship and meeting deadlines continuously. Their admin staff maintained communication at all times and made sure completions were timely and thorough. Overall they are a very professional outfit and I will recommend ND Global to anyone if I am ever approached.

Cameron Lee
Superintendent - Downer

N D Global is a valued construction partner to Downer delivering our NBN Multi Dwelling Units program. They maintained excellent quality standard of service while maintaining co-operative relations with us. They have been one of the best construction partners we have had.

Ildo Tomasiello
Project Manager - Downer

Well done to the installation team. They have been very professional and accommodating in the installation. Patience of saints in getting access to all the partners and flexile. A huge thank you to the team.

Graeme Gherashe
Chair Strata Member - A 60+ Units building in Wolloomooloo